+86-13963746955
All Categories
pc123  2 ton crawler excavator-0

Mini Excavator

Home >  Products >  Excavator >  Mini Excavator

PC12.3 | 1.2 Ton Crawler Excavator

High-quality mini excavators, 1.2 ton small excavators, one-year quality guarantee, customizable colors, logos, packaging, etc

Engine:KAMA 195FD

Operating weight:1180 kg

Maximum digging depth:1750 mm

Bucket capacity:0.025m^3

Product Description

The 1.2 ton mini excavator is equipped with ISO,CE and EPA certifications

Model PC12.3
Engine Model KAMA 195FD
Emission standard EURO5
Power 8.3 kw
Engine speed 3000 rpm
Track type 180*72*37
Bucket capacity 0.025 m^3
Dimension L*W*H 2850*1050*2200 mm
With cabin height 2300 mm
Minimum length 2400 mm
Minimum ground clearance 90 mm
Max. Digging Height 2600 mm
Max. Dumping Height 1750 mm
Max. Digging Depth 1750 mm
Max. Digging Radius 3100 mm
Operating Weight 1180 kg

Application scenarios and precautions

1. Municipal and Landscape engineering

1.1. Before commencing work, confirm the location of underground pipelines. This can be done through pipeline detectors to prevent important pipelines such as gas and electricity from being dug up and broken.

1.2. When working on sidewalks, protective plates should be laid to prevent the tracks from crushing and damaging the pavement tiles or asphalt layer.

2. Rural and agricultural operations

2.1. Field operations should avoid areas where crops grow, control the depth of excavation, and prevent damage to the structure of the soil tillage layer.

2.2. When operating in the orchard, pay attention to protecting the root system of fruit trees. Keep a safe distance from the tree trunks when digging fertilizer trenches and other facilities to prevent damage to the tree roots.

3. Architectural decoration and interior engineering

3.1. Before indoor work, clear obstacles from the site, check the load-bearing capacity of the floor slabs, and if necessary, build support structures.

3.2. During demolition operations, control the crushing force to avoid excessive vibration affecting the main structure of the building, and at the same time, take good dust protection measures.

4. Emergency rescue scenarios

4.1. When clearing landslides, first observe the stability of the slope, and carry out operations in layers from top to bottom to prevent secondary landslides from causing danger.

4.2 Before emergency repair work, set up warning signs, demarcate safe operation areas, and prevent irrelevant personnel from entering the operation site.

Contact Us

Number:+86-13963746955
Email:[email protected]

Things to know before buying:
1. Storike is a factory
2. We have sufficient stock and fast production lines
3. Professional sales team to answer your questions
4. Welcome to visit the factory
5. Visualize the entire production process
6. Stable delivery time and privacy protection for shipping

Things to know after purchasing:
1. 365 days warranty and lifetime after-sales service
2. Provide comprehensive user manuals and guidance
3. Provide various auxiliary equipment and accessories
4. No threshold for recruiting agents
5. Lifetime exclusive customer service with 24-hour one-on-one service

Get a Free Quote

Our representative will contact you soon.
Email
Mobile/WhatsApp
Required Product
Name
Company Name
Message
0/1000
inquiry

Get a Free Quote

Our representative will contact you soon.
Email
Mobile/WhatsApp
Required Product
Name
Company Name
Message
0/1000
Email Email WhatsApp WhatsApp
WhatsApp
WeChat WeChat
WeChat
toptop

Related Search