High-quality mini excavators, 1.2 ton small excavators, one-year quality guarantee, customizable colors, logos, packaging, etc
Engine:KAMA 195FD
Operating weight:1180 kg
Maximum digging depth:1750 mm
Bucket capacity:0.025m^3
The 1.2 ton mini excavator is equipped with ISO,CE and EPA certifications
| Model | PC12.3 |
| Engine Model | KAMA 195FD |
| Emission standard | EURO5 |
| Power | 8.3 kw |
| Engine speed | 3000 rpm |
| Track type | 180*72*37 |
| Bucket capacity | 0.025 m^3 |
| Dimension L*W*H | 2850*1050*2200 mm |
| With cabin height | 2300 mm |
| Minimum length | 2400 mm |
| Minimum ground clearance | 90 mm |
| Max. Digging Height | 2600 mm |
| Max. Dumping Height | 1750 mm |
| Max. Digging Depth | 1750 mm |
| Max. Digging Radius | 3100 mm |
| Operating Weight | 1180 kg |
Application scenarios and precautions
1. Municipal and Landscape engineering
1.1. Before commencing work, confirm the location of underground pipelines. This can be done through pipeline detectors to prevent important pipelines such as gas and electricity from being dug up and broken.
1.2. When working on sidewalks, protective plates should be laid to prevent the tracks from crushing and damaging the pavement tiles or asphalt layer.
2. Rural and agricultural operations
2.1. Field operations should avoid areas where crops grow, control the depth of excavation, and prevent damage to the structure of the soil tillage layer.
2.2. When operating in the orchard, pay attention to protecting the root system of fruit trees. Keep a safe distance from the tree trunks when digging fertilizer trenches and other facilities to prevent damage to the tree roots.
3. Architectural decoration and interior engineering
3.1. Before indoor work, clear obstacles from the site, check the load-bearing capacity of the floor slabs, and if necessary, build support structures.
3.2. During demolition operations, control the crushing force to avoid excessive vibration affecting the main structure of the building, and at the same time, take good dust protection measures.
4. Emergency rescue scenarios
4.1. When clearing landslides, first observe the stability of the slope, and carry out operations in layers from top to bottom to prevent secondary landslides from causing danger.
4.2 Before emergency repair work, set up warning signs, demarcate safe operation areas, and prevent irrelevant personnel from entering the operation site.
Number:+86-13963746955
Email:[email protected]
Things to know before buying:
1. Storike is a factory
2. We have sufficient stock and fast production lines
3. Professional sales team to answer your questions
4. Welcome to visit the factory
5. Visualize the entire production process
6. Stable delivery time and privacy protection for shipping
Things to know after purchasing:
1. 365 days warranty and lifetime after-sales service
2. Provide comprehensive user manuals and guidance
3. Provide various auxiliary equipment and accessories
4. No threshold for recruiting agents
5. Lifetime exclusive customer service with 24-hour one-on-one service
Copyright © by 2025 Shandong Storike Engineering Machinery Co., Ltd.